Top Knot LLC

Project Type: 
Design / Build Project
Project Summary: 
New 28,000 S.F. Office & Distribution Facility
Project Manager/Engineer: 
Frank A. DeMarinis, P.E.
Lead Designer: 
Jon Solecki
Construction Supervisor: 
Tristan P. Kiendzior, L.C.S.
Project Description: 
Sage Engineering designed, permitted and constructed a 28,000 S.F. office and distribution facility. The building consists of two units with 18 foot eave heights, loading docks, and multiple at grade overhead doors. The construction was for two companies one that occupies the front and one in the back of the building.
Client: 
Top Knot LLC.
Location: 
Enfield, CT
Design and Permitting: 
June 2008 to July 2008
Construction Date: 
July 2008 to November 2008
Top Knot LLC